View Issue Details
ID | Project | Category | View Status | Date Submitted | Last Update |
---|---|---|---|---|---|
0001091 | Dwarf Fortress | Dwarf Mode -- Buildings, General | public | 2010-04-13 10:42 | 2014-08-04 11:02 |
Reporter | Zeg | Assigned To | Toady One | ||
Priority | low | Severity | minor | Reproducibility | always |
Status | resolved | Resolution | fixed | ||
Product Version | 0.31.03 | ||||
Fixed in Version | 0.40.07 | ||||
Summary | 0001091: Building a paved road requires more materials than it should when the road zone is partially blocked | ||||
Description | When trying to build a road, if you resize the 'zone' for road placement and then part of that zone is 'under' another building (like a wall), the ammount of building material required still counts the non-road squares. | ||||
Steps To Reproduce | 1) Lay out the 'zone' of a 1x5 road and see that it should need 2 material to build. 2) Build a 1x5 wall 3) Lay out the road zone again, but this time make it 2x5 and 'slide' half the zone footprint under the wall. You're still only building a 1x5 road, but now it wants 3 material to build, seeming to count the tiles 'under' the wall. | ||||
Tags | construction, road | ||||
|
Seconded. This also happens if the road footprint overlaps with existing natural rock (same process to demonstrate) |
|
Can confirm in 0.40.06 - three logs are used to build a "2x5" road with only 5 tiles built, while only two logs are used for a 1x5 (fully built) road. Updating title to clarify this. |
Date Modified | Username | Field | Change |
---|---|---|---|
2010-04-13 10:42 | Zeg | New Issue | |
2010-04-13 10:43 | Zeg | Tag Attached: construction | |
2010-04-13 10:43 | Zeg | Tag Attached: road | |
2010-04-19 03:30 | Nimblewright | Note Added: 0004209 | |
2014-08-04 10:30 | lethosor | Note Added: 0028291 | |
2014-08-04 10:30 | lethosor | Assigned To | => lethosor |
2014-08-04 10:30 | lethosor | Status | new => confirmed |
2014-08-04 10:30 | lethosor | Summary | Building a Paved Road wants more materials than it should when the road zone is partially blocked => Building a paved road requires more materials than it should when the road zone is partially blocked |
2014-08-04 11:02 | Toady One | Status | confirmed => resolved |
2014-08-04 11:02 | Toady One | Fixed in Version | => Next Version |
2014-08-04 11:02 | Toady One | Resolution | open => fixed |
2014-08-04 11:02 | Toady One | Assigned To | lethosor => Toady One |
2014-08-10 18:42 | lethosor | Relationship added | related to 0007937 |