View Issue Details
ID | Project | Category | View Status | Date Submitted | Last Update |
---|---|---|---|---|---|
0012939 | Dwarf Fortress | Dwarf Mode -- Jobs, Building Construction and Destruction | public | 2024-08-02 19:10 | 2024-08-02 19:10 |
Reporter | Bumber | Assigned To | |||
Priority | normal | Severity | minor | Reproducibility | always |
Status | new | Resolution | open | ||
Platform | Steam | OS | Windows | OS Version | 8.1 |
Product Version | 50.11 | ||||
Summary | 0012939: Deconstructing track stop while linking lever causes cancel message (inconsistency) | ||||
Description | There's an inconsistency that destroying a track stop while linking to a lever causes a "No target building" or "Job item lost or destroyed" message (depending on how far along the linking process is). Other linkable building types cancel silently. This is handled by code in the "buildingst::blastbuilding" function, according to Quietust. | ||||
Steps To Reproduce | 1. Order a track stop to be deconstructed while ordering a lever to link to it. 2a. If the track stop deconstructs before the link job on the stop, then "No target building". 2b. If the track stop deconstructs after the link job on the stop, but before link job on lever, then "Job item lost or destroyed". 2c. If the track stop deconstructs after link job on the lever, then no issue. Repeat for a different linkable building type (e.g., door) and observe no cancel message for 2a or 2b. | ||||
Tags | No tags attached. | ||||
Date Modified | Username | Field | Change |
---|---|---|---|
2024-08-02 19:10 | Bumber | New Issue |