Description | I noticed I had a floor constructed on top of some soil. Later I wanted to add a basement pathway into the building, so I had one tile of floor designated for removal, at the same time I built the up star one z-level beneath the site for the floor hatch. A dwarf then proceeded to dig the up stair, then removed the constructed floor from beneath the existing soil (somehow telepathically, no doubt, as the removal of the soil could not yet be designated as the construction had not yet been removed). Just seemed to be a bit unrealistic. |
---|