View Issue Details

IDProjectCategoryView StatusLast Update
0010272Dwarf FortressDwarf Mode -- Jobs, Assignment of Jobspublic2017-07-29 14:15
ReporterDIMOHA25 Assigned ToLoci  
PrioritylowSeverityminorReproducibilityhave not tried
Status resolvedResolutionduplicate 
PlatformPCOSWindows 10 
Product Version0.43.05 
Summary0010272: Two jobs active in the same workshop at the same time
DescriptionHad two smiths try to work at the same time at my magma forge. Both tasks were on [n]/high priority/do task now!/whatever. One was ordered manually and one was ordered in the workshop profile. Tasks were different. Both tasks were marked as active in the workshop and both jobs were in fact active. The first smith worked as usual and the second one was walking around the workshop, trying to enter. (unable to enter from what I've seen)
Steps To ReproduceNo idea, but your best bet would be having a workshop order in place, but not active. Then manually adding an order and putting both on [n].
TagsNo tags attached.

Relationships

duplicate of 0008805 confirmeduser11 Simultaneous stonecrafting and slab engraving jobs in craftsdwarf workshop 

Activities

There are no notes attached to this issue.

Issue History

Date Modified Username Field Change
2017-07-29 13:47 DIMOHA25 New Issue
2017-07-29 14:15 Loci Relationship added duplicate of 0008805
2017-07-29 14:15 Loci Status new => resolved
2017-07-29 14:15 Loci Resolution open => duplicate
2017-07-29 14:15 Loci Assigned To => Loci