View Issue Details

IDProjectCategoryView StatusLast Update
0009870Dwarf FortressDwarf Mode -- Buildings, Generalpublic2016-07-06 22:24
ReporterTOAST7312 Assigned ToLoci  
PrioritynormalSeverityminorReproducibilityhave not tried
Status resolvedResolutionduplicate 
Product Version0.43.03 
Summary0009870: two dwarves, one forge
DescriptionI had been melting iron objects, then designated production of three iron chains at one magma forge. I then designated for all three of the chains to be done 'now'. A few minutes later I looked at my unit/job list and found two dwarves forging iron chains at the same magma forge.
Steps To ReproduceBasically, I created 3 iron chain tasks at 1 magma forge and hit 'do task now' for all 3.
Additional InformationImages of the issue:

Picture of the two active jobs in one forge:
http://imgur.com/8RLsvhU

Picture of two dwarves stacked in the forge:
http://imgur.com/Ay0p7G4

Picture of two iron bars being used for two tasks in hte same forge:
http://imgur.com/OC3hsgo

Picture of job list showing two active forging tasks:
http://imgur.com/RzcLjJG
Tagsmagma forge, tasks, workshop

Relationships

duplicate of 0008805 confirmeduser11 Simultaneous stonecrafting and slab engraving jobs in craftsdwarf workshop 

Activities

eniteris

2016-06-27 14:38

reporter   ~0035497

Can confirm that I've experienced this bug as well. For me, one "do now" order is carried out at the same time as another order.

Loci

2016-06-27 17:54

viewer   ~0035503

duplicate 0008805

Issue History

Date Modified Username Field Change
2016-06-26 17:16 TOAST7312 New Issue
2016-06-26 17:29 TOAST7312 Tag Attached: magma forge
2016-06-26 17:29 TOAST7312 Tag Attached: workshop
2016-06-26 17:30 TOAST7312 Tag Attached: tasks
2016-06-27 14:38 eniteris Note Added: 0035497
2016-06-27 17:54 Loci Note Added: 0035503
2016-07-06 22:24 Loci Relationship added duplicate of 0008805
2016-07-06 22:24 Loci Status new => resolved
2016-07-06 22:24 Loci Resolution open => duplicate
2016-07-06 22:24 Loci Assigned To => Loci